Work continues at The Rivi site in Foley, Alabama. With the exterior of the clubhouse being situated, the interior is being framed and prepared for drywall. Next to the clubhouse, the location of the future pool is being excavated and soon concrete will be poured. Throughout the site, roadways are being shaped and cutout for back fill. Check back soon for more updates about Rivi and more exciting news about our projects.
CRESTLINE CONSTRUCTION
Comments